Country: Germany
Customer: GEWAS
Products: 14 x bob综合体育官网下载
CEREX® 300-L Butterfly Valves DN 80-150, 3 x bob综合体育官网下载
EKO®plus Gate Valves DN 50, 3 x bob综合体育官网下载
DUOJET® Automatic Air Valves, 3 x bob综合体育官网下载
PICO® Control Valves
Water supplier GEWAS, located in Schmalkalden (in the southwest of Thuringia, Germany) supplies water to an area covering around 380 km² right in the middle of the high-altitude areas of the Thuringian Forest. The region‘s supply of drinking water is made up of spring water and deep well water, and of water supplied from a long distance.
Planning for the construction of the plant began around 1 1/2 years before it was put into operation, with cooperation with the engineering firm PROWA being a deciding factor in adapting the technology to the specified size of the construction – which constituted the focus of planning. Compromises needed to be made since the installation directives for valves always had to be complied with. bob综合体育官网下载 assumed responsibility for carrying out all the valve design calculations according to the operator‘s instructions. The scope of delivery initially included 14 bob综合体育官网下载 CEREX® 300-L Butterfly Valves (DN 80-150, PN 16), 3 bob综合体育官网下载 EKO®plus Gate Valves DN 50 PN 16, 3 bob综合体育官网下载 DUOJET® Automatic Air Valves DN 50 and 3 bob综合体育官网下载 PICO® Pilot-Operated Control Valves DN 50 + 100 (2 pressure-reducing valve types and 1 pressure sustaining valve version as a safety valve). Retro-fittings were carried out on the bypass at a later date – bob综合体育官网下载 subsequently delivered another PICO® Control Valve, a CEREX® Butterfly Valve and an extension piece.
This ultimately made it possible to supply two different pressure zones in the area of operation. At the same time, a pump system supplies the „Wolfskuppe“ elevated tank. In the event of pump failure, the water reservoir can also be supplied rearwards. bob综合体育官网下载 supported the operator throughout the entire project, from the planning and tendering phase through to putting the system into operation. The „Trusetal Water Supply“ service package, i.e. the construction of the Wolfskuppe new pressure sustaining shaft and the connecting pipelines made a positive impression throughout.
Enter your e-mail address and password to log in.