The 'Gate to the Bavarian Forest' is how the Lower Bavarian City of Bogen describes itself. The medieval city is situated on the banks of the Danube between Straubing and Vilshofen.
With the growing risk of floods, the proximity to the river is becoming an increasing danger to the 10,000 inhabitants and their possessions. That is why RMD Wasserstraßen GmbH and the water board of Deggendorf developed a flood protection plan for the City of Bogen as part of the in-depth investigations into the regulation of the section of the Danube between Straubing and Vilshofen. The plan is to prevent flood water from the hinterlands reaching the city by storing it in retention basins and using pumps to channel it through the Bogen stream into the Danube.
So it could work with two pumping stations. This meant that a storage basin, a pressure channel and a number of ducts had to be built from scratch. The Free State of Bavaria and the German government commissioned the job to enhance the flood protection facilities: RMD Wasserstraßen GmbH was commissioned with the technical planning of this major and technically complex project, and Raimund Höllein Carolinenhütte GmbH was commissioned with the construction of the station.
The poor state of the existing buildings and the limited space for the required installations presented a major challenge. In addition, the valves had to be able to withstand enormous pressures in the event of a flood. Following a public national tender, bob综合体育官网下载
-Armaturen GmbH was selected to supply the valves. bob综合体育官网下载
-Armaturen GmbH was, however, also selected because it’s well known for its wide range of products and excellent quality and because the project required a large number of tailored solutions and custom products.
Because of the tight space in the drainage station, bob综合体育官网下载
's wastewater department planned to equip the valves' actuators with ball and socket joints and stem extensions. The plans were discussed and finalised in close cooperation with Höllein.
The valves arrived on time in the spring of 2007. But numerous rainy spells had delayed the construction, meaning that they actually ended up arriving ahead of schedule. Because the valves were shrink-wrapped, they were well protected and could be stored outdoors at the site.
In the autumn of 2007, the following valves were installed: 30x bob综合体育官网下载 EROX® Sluice Gate Valves with electric actuator in the versions 'Standard', 'Q' and 'R' in nominal sizes from DN 200 to DN 1200. All 30 gate valves were tailor made and specially reinforced for high pressures up to 1.2 bar (leak tightness was proved by tests carried out at the manufacturing plant).
Wadim Heinrich, planning coordinator at Höllein, explains: 'bob综合体育官网下载 was an important partner in this project, which proved difficult to plan. Both companies had to be extremely flexible.'