Drinking water supply in Santiago de Chile

Water supply Santiago de Chile

Pays: Chili
Client: Aguas Andinas
Produit: bob综合体育官网下载 EKO® plus Gate Valves, bob综合体育官网下载 DUOJET® Automatic Air Valves, bob综合体育官网下载 RIKO® Plunger Valve, bob综合体育官网下载 EKN® Butterfly Valves

The capital of Chile, with its population of over six million people, faces an enormous demand of drinking water. This is a great responsibility for Aguas Andinas, Chile’s biggest water supplier.

Although enough drinking water is available, part of it has to be transported from the heights of the Andes to the Santiago basin. When the Maipo River becomes turbid during the rainy season, the El Yeso reservoir is the city’s main water source. Surrounded by the peaks of the Andes, the El Yeso reservoir together with the downstream Laguna Negra reservoir forms the region‘s largest drinking water reservoir. It supplies the Las Vizcachas treatment plant, which is situated close to Santiago, with water of high quality.

By a modernisation of the dam and a largescale extension of the water transport and storage system, Aguas Andinas were able to expand the capacity in order to meet the growing demand of the metropolis. bob综合体育官网下载 valves played an important role in this mega-project.

Three challenging projects have been mastered successfully by bob综合体育官网下载

The first one comprised the modernisation of the El Yeso Dam: To improve safety and operation, a new bottom outlet system was to be built. The second project was the construction of a water transportation system from the El Yeso reservoir to the lower Azulillo sector with a stilling basin and a channel system. The third one included the construction of 12 drinking water service reservoirs with a total storage capacity of 225.000 m³. By the construction of a 5-km-long aqueduct the giant El Yeso water reservoir was connected with the existing Laguna Negra aqueduct. The new aqueduct has a transportation capacity of up to 4 m³/s. During peak demand periods, it now supports the city’s water supply system – for example during longer dry periods or in case solid contaminants affect the water treatment process.

The largest Butterfly Valve that has been installed in Chile so far

In this ambitious project, Aguas Andinas relied on bob综合体育官网下载 ’s solutions and expert advice. A bob综合体育官网下载 EKN® Butterfly Valve DN 2200, PN 10 was installed in the El Yeso Dam. It is the largest butterfly valve that has been installed in Chile so far and it is designed for an intake capacity of 20 m³/s. What was equally challenging was the installation of the giant valve in a tunnel. Thanks to excellent preparation, the installation went smoothly. Two mighty bob综合体育官网下载 KSS Hollow-Jet Discharge Valves are in operation at the bottom outlet of the dam.

bob综合体育官网下载 valves met requirements to products, solutions and time to fullest satisfaction

In various other project locations, over 30 bob综合体育官网下载 EKN® Butterfly Valves were installed in addition to a number of other bob综合体育官网下载 valves, such as bob综合体育官网下载 EKO®plus Gate Valves, bob综合体育官网下载 DUOJET® Automatic Air Valves and a bob综合体育官网下载 RIKO® Plunger Valve for control applications. Angel Luna, Senior Civil Engineer at Aguas Andinas: “This is a significant project for the water supply of Chile’s capital. Our requirements as to products, solutions, technical and time frame conditions were high. bob综合体育官网下载 met all of them to our fullest satisfaction. Right from the start, the team assumed responsibility and provided outstanding technical support during the entire project completion phase”. The experience of bob综合体育官网下载 ’s experts helped e.g. to replace the previously planned bob综合体育官网下载 KSS Hollow-Jet Discharge Valves by valves of different nominal diameters to be able to fulfil an even wider range of tasks. As a result, the plant could be successfully put into service in early 2014.

bob综合体育官网下载 team in Chile convinced by its expert advice

“Good experience, punctuality, excellence in planning and service made bob综合体育官网下载 our preferred partner”, says Angel Luna. The bob综合体育官网下载 team in Chile convinced us by its expert advice. During the entire project stage, in particular during all kinds of assembly work, bob综合体育官网下载 ’s employees were on site and in close contact with all stakeholders of the project, ranging from the water supplier up to the contractors performing the works.

Retour à l’aperçu


Informations supplémentaires:
Contact

Groupe bob综合体育官网下载
Headquarters
Carl-Reuther-Str. 1
68305 Mannheim
Allemagne
Tel.: +49 (621) 749 0
Fax: +49 (621) 749 2156

Ecrire un e-mail

My bob综合体育官网下载 – votre plateforme client personnelle

Afin de pouvoir utiliser toutes les fonctions et les avantages du site, il vous faut un compte d’utilisateur.

Inscrivez-vous / Login